Skip to content

New Year, New Rules:
A Summary of 2025/2026 Drainage Permit Changes in MN and the Dakotas

As we flip the calendar, farmers across the Midwest are facing more than just a change in weather. A new wave of legislative updates and environmental regulations is shifting the landscape of water management. For anyone looking to improve their land, staying compliant is just as important as the installation itself.
 
Navigating the web of local and state requirements can be daunting. Whether you are adding a few laterals or installing a massive new system, understanding Midwest agricultural drainage regulations is the first step to ensuring your project isn't sidelined by red tape. At Ag Tech Drainage, we don't just move dirt—we help you navigate the paperwork that makes it possible.
 

Minnesota: The New Disclosure Era (H.F. No. 3389)


The biggest headline in Minnesota for the 2025/2026 season is the full implementation of subsurface drainage disclosure laws. This isn't just about how you tile; it’s about how you track it.
 
  • Mandatory Disclosure: As of late 2024 and heading into 2025, sellers of agricultural land must disclose the status and location of all subsurface drain tile systems to potential buyers.
 
  • The Certificate of Disclosure: County recorders can no longer process land sales without a certificate disclosing the presence of drain tile.
 
  • The "Six-Year" Rule: If a seller fails to disclose a known system, they can be held liable for maintenance and repair costs for up to six years after the sale.
 
  • Why Precision Mapping Matters: This law highlights the absolute necessity of high-quality LIDAR and GPS mapping. Having a digital record of your system isn't just a convenience anymore—it’s a legal protection for your land’s value.
 

North Dakota: Streamlining the "80-Acre Rule"


North Dakota continues to refine its "80-Acre Rule," which serves as the threshold for many drainage projects. For 2025/2026, the focus is on more rigorous downstream impact analysis.
 
  • Permit Thresholds: In most jurisdictions, any project draining a pond, slough, or lake with a watershed area of 80 acres or more requires a state permit from the Department of Water Resources.
 
  • Downstream Impact Surveys: New guidance for this season places a higher emphasis on proving that your tile outlet will not adversely affect neighbors or public infrastructure.
 
  • Localized Control: Many North Dakota Water Resource Districts are adopting digital submission portals to speed up the Permits process, but they require more precise technical data (like flow rates and elevations) up front.
 

South Dakota: Vested Rights and Wetland Compliance


South Dakota's regulatory environment remains focused on "Vested Rights" and the protection of natural basins.
 
  • Vested Rights Deadlines: Farmers are encouraged to document existing systems to establish "vested rights," ensuring older systems are legally recognized under newer, stricter codes.
 
  • Wetland Conservation: The 2025/2026 season sees a push for better integration between state drainage permits and federal "Swampbuster" compliance. Ensuring your tiling project doesn't inadvertently drain a protected wetland is critical to maintaining USDA program eligibility.
 

Why Midwest Agricultural Drainage Regulations are Getting Stricter

 

You might wonder why the rules seem to change every year. The shift in Midwest agricultural drainage regulations is driven by several factors:
 
  • Water Quality: States are under pressure to reduce nutrient runoff (nitrogen and phosphorus) into major watersheds.
 
  • Flood Mitigation: Managing "peak flow" ensures that agricultural drainage doesn't overwhelm county ditches and roads during heavy spring thaws.
 
  • Land Value Transparency: As demonstrated by the Minnesota bill, there is a push to treat drainage systems as permanent, high-value infrastructure that must be documented like any other utility.
 

How Ag Tech Drainage Simplifies Compliance

 

Staying ahead of these rules is a full-time job. When you partner with us for your Farm Drainage Project, we provide more than just the equipment.
 
  • Data-Driven Applications: We use LIDAR and specialized software to generate the exact maps and flow data that regulators require.
 
  • Local Expertise: We serve a massive footprint across MN, ND, and SD, meaning we already have relationships with the county auditors and watershed managers in your area.
 
  • Warranty and Proof: We provide a final Installation Map that serves as your permanent record for state disclosure and future land sales.
 

Conclusion: Don't Let Red Tape Stop Your Progress


The 2025/2026 season promises to be a productive one, but only for those who plan ahead. Understanding Midwest agricultural drainage regulations early in the winter allows you to get your permits in order so that you can hit the ground running the moment the frost breaks.

Ready to start your next project with total confidence? Contact Ag Tech Drainage today for a free estimate and professional guidance on the permits you'll need for success.
 
Contact Us